SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is an acceptable thickness for long training dog leash, it has both strength and portability
NO TANGLE LONG ROPE LEASH: the round mountaineering rope and 360 degree rotating clasp design long training leash will not tangle if it is in use or when you roll it up, great for mountain climbing, camping, training, hunting, backyard, beach, recall training, out of doors play with tennis balls, and swimming
LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material may not get an increasing number of heavy in the water and won’t sink, it is going to go with the flow when submerged and highly visible against any background.
SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer take care of, the joint of the rope is sewn by the machine and is very strong.
SIZE: 3/8″ (9.5 mm) in diam ,Size of this one is 30foot,color blue, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose








Reviews
There are no reviews yet.